Arjun Mehta
Signs off the financial statements in every DPR. Sixteen years across assurance, audit and institutional credit documentation — the standard a credit committee and a statutory auditor expect is the standard he prepares to.
Projectzo is a Global business consulting firm having a dedicated ISO 9001:2015 certified division for DPR consultancy, practising since 2010. Our DPRs are intelligently crafted by keeping bankers and approval committees in mind. Projectzo is known for its business ethics and on-time delivery.
Twelve modules, named in the vocabulary a credit committee uses internally. A DPR consultant who cannot name them is describing a pre-built document, not a DPR.
Displayed for inspection; never offered as a download. Redacted where the client requires it — otherwise exactly as the DPR consultant submitted it to the institution. Three of the six are not financial pages — they prove a practice, not a spreadsheet.
No anonymous team. Each detailed project report is held by a named accountable partner and read adversarially by a second before it leaves the practice. The people below are accountable for it. Behind them sits the practice that produces it.
Market sections are drawn from paid subscription databases and cited in-document. Engineering drawings, structural decisions and utility matrices are produced in-house — the three-quarters of a Corporate DPR that precede the financials.
One consultant and one standard for every purpose a DPR serves, from an MSME term loan to a consortium mandate. Each use case shows the plan that fits it.
Term debt and working-capital limits from banks and NBFCs, with CMA data in the six prescribed forms.
Scheme applications, state industrial-policy capital subsidies and PLI, with the schedules the nodal agency examines.
Greenfield units and expansions that need market feasibility, location and SWOT, engineering drawings and MPBF.
Consortium and multiple-banking arrangements, external credit rating, TEV and LIE review.
Private equity, strategic investment and board-level documentation, argued for your specific mandate.
Industrial land allotment through SIDCs and submissions to state incentive boards.
Vagueness about timelines is how a DPR consultant signals inexperience to a promoter working to a sanction deadline. The delivery date is fixed the moment you book.
Choose MSME, PRO or CORPORATE and pay 50% online. Your GST invoice and the delivery date arrive by email.
The consultant authoring your DPR confirms your inputs, then models, stress-tests and maps the instrument. The accountable partner reads it before it leaves the practice.
Your submission-ready DPR arrives on the promised date; the balance 50% is paid from your invoice email. We stay with you through the bank’s appraisal.
Consortium lead banks, NBFCs, rating agencies, state industrial development corporations and incentive boards — 490+ institutions have sanctioned on the strength of a Projectzo detailed project report. The cases below are drawn from the practice's engagement records: ticket size, sector, instrument, outcome.







Promoters are not named and figures are rounded. Each record is held in the practice's engagement file with the sanction letter and the quotation that fixed the delivery date.
The DPR is built to the structure a credit committee is trained to read: leverage and coverage ratios computed to the lender's own covenants, incentives treated the way its policy prefers, and a sensitivity schedule that answers the committee's questions before they are asked.
Where a lender appoints an independent TEV consultant or an LIE, the DPR consultant prepares the detailed project report so the reviewer validates rather than rebuilds — which is what keeps a sanction on its original timeline.
What a detailed project report must contain for an institution to appraise it, which schemes it serves, and where regulatory treatment applies.
A DPR for a bank loan runs from promoter profile and feasibility to the financial core: cost of project, means of finance, projections and CMA data in the six prescribed forms. A competent DPR consultant writes each section for credit-committee scrutiny.
On a bank loan of ₹5 crore and above, lenders test covenants: debt-equity of 2:1 to 3:1, DSCR averaging 1.50 (floor 1.25), TOL/TNW and current ratio within band, Tandon Method II for working capital. The DPR consultant stress-tests each against the lender's own covenant — see DSCR, MPBF and the current ratio and sensitivity analysis in a project report.
Capital subsidies vary by state and project size, PLI tracks incremental production, and larger exposures draw TEV review. Grants under IND-AS 20 must run consistently through depreciation, DSCR and means of finance — the section most often rebuilt at the branch, and the one a detailed project report consultant gets right first.
The fee tracks the work a proposal needs — not its size. Every engagement is authored by the practice’s professionals; what changes across the scopes is how much site, engineering, market and structural work the proposal requires.





